Combustion control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845954
APP PUB NO 20150125799A1
SERIAL NO

14532327

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to realize a combustion control device that reduces, when a pressure within a mixer is rapidly increased at the time of ignition of the combustion control device, the transmission of the temporarily increased pressure to a pressure sensor, that brings the pressure sensor into a non-operated state and that thereby can continue combustion in the combustion control device. Hence, a combustion control device is provided that includes: a combustion chamber which has a heat dissipation disc on a front surface and within which a combustion room is formed; a burner which is attached to the combustion chamber; a mixer which mixes a gas supplied to the burner with air; and a pressure sensor which is connected to the mixer through a pressure passage, where a pressure propagation delay means which reduces transmission to the pressure sensor caused by a temporary pressure increase within the mixer is provided partway along the pressure passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIZUOKA SEIKI CO LTD4-1 YAMANA FUKUROI-SHI SHIZUOKA-KEN 4378601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wakabayashi, Hiroaki Shizuoka, JP 33 240

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00