Method of production rare-earth magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847169
SERIAL NO

14781425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method includes producing a rare-earth magnet precursor (S′) by performing first hot working in which, in two side surfaces of a sintered body, which are parallel to a pressing direction and are opposite to each other, one side surface is brought to a constrained state to suppress deformation, and the other side surface is brought to an unconstrained state to permit deformation; and producing a rare-earth magnet by performing second hot working in which, in two side surfaces (S′1, S′2) of the rare-earth magnet precursor (S′), which are parallel to the pressing direction, a side surface (S′2), which is in the unconstrained state in the first hot working, is brought to the constrained state to suppress deformation, and a side surface (S′1), which is in the constrained state in the first hot working, is brought to the unconstrained state to permit deformation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshina, Eisuke Toyota, JP 14 81
Kano, Akira Toyota, JP 111 310
Kobuchi, Dai Nagoya, JP 4 0
Miyamoto, Noritaka Toyota, JP 52 387
Yamashita, Osamu Toyota, JP 109 1015

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00