Utility pole mounted solar panels and securing brackets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847748
SERIAL NO

15500096

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical transmission system has solar electrical generation stations mounted directly to existing utility poles along a transmission line. Solar panels and securing brackets define each solar electric generation station. Each station has at least one generally East facing panel, at least one generally South facing panel, and at least one generally West facing panel. A power coupling conducts electricity generated by the solar electric generation station into the transmission lines. In one embodiment, a plurality of spacer members support the separate and distinct solar collector surfaces in a fixed position relative to the utility pole and have a plurality of clamp passages. A plurality of clamps pass through the clamp passages to guide and retain the clamps. In another embodiment, a plurality of adjustable brackets affix with the spacer members adjacent a first end and to the utility pole adjacent a second end distal to the first end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kornovich, Lonnie L Clear Lake, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00