Lead screw guide assembly and three-dimensional printing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849662
SERIAL NO

14599536

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a lead screw guide assembly and a three-dimensional (3D) printing apparatus, wherein the lead screw guide assembly includes a base, a first guiding member, a second guiding member and a lead screw guide. The first guiding member is disposed on the base and has a first channel extending along an axis. The second guiding member is movably coupled to the first guiding member along the axis. The lead screw guide is movably disposed on the base along the axis and located in the first channel. The lead screw guide is coupled to the second guiding member, so as to drive the second guiding member to move along the axis and hide in the first channel or protrude from the first channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CAL-COMP ELECTRONICS & COMMUNICATIONS COMPANY LIMITED;KINPO ELECTRONICS, INC.;XYZPRINTING, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Jui-Feng New Taipei, TW 14 96
Din, Shih-Jer New Taipei, TW 16 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00