Vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849792
SERIAL NO

14395104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a motor serving as a driving source configured to run the vehicle, and a high-power and high-capacity assembled batteries, each of the assembled batteries being formed to include secondary batteries configured to supply an electric power to the motor, the secondary batteries of the assembled batteries being housed in different cases. The high-power and high-capacity assembled batteries are arranged around a luggage space located in a rearward portion of the vehicle. The high-power assembled battery is chargeable and dischargeable with a current larger than a current in the high-capacity assembled battery. The high-capacity assembled battery has an energy capacity larger than an energy capacity of the high-power assembled battery. The high-capacity assembled battery is arranged above or below the high-power assembled battery in the vehicle, and at least a portion of the high-capacity assembled battery protrudes from the high-power assembled battery rearward in the vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Kenji Miyoshi, JP 339 3546
Sato, Akihiro Nagoya, JP 206 2560

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00