Mobile crane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850107
SERIAL NO

15204342

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mobile crane includes: a crane main-body having a lower traveling body and an upper swing body; and a counterweight carrier. The counterweight carrier has a wheel, a wheel driving device, and a steering device. At least one of the crane main-body and the counterweight carrier has a controller which causes the steering device to steer the wheel. The controller causes the steering device to steer the wheel by a steering operation which requires a smaller steering amount of the wheel between one steering operation in which the steering device swivels the wheel in one direction to make the orientation of the wheel correspond to the front-back direction of the lower traveling body and another steering operation in which the steering device swivels the wheel in a direction opposite to the one direction to make the orientation of the wheel correspond to the front-back direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBELCO CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwazawa, Takahiro Hyogo, JP 5 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00