Complex plating film formed using multi-layer graphene-coated metal particles through electric explosion and method of manufacturing the complex plating film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850592
SERIAL NO

14804398

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of forming a complex plating film using multi-layer graphene metal particles. The method of forming the plating film may include preparing a powder with a metal particle structure coated with multi-layer graphene, and forming a plating film by adding the powder to a plating solution through electric plating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH & BUSINESS FOUNDATION SUNGKYUNKWAN UNIVERSITY2066 SEOBU-RO JANGAN-GU GYEONGGI-DO SUWON-SI 16419

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Byung-Wook Suwon-si, KR 10 235
Baeg, Seung-Bin Suwon-si, KR 4 10
Cho, Younglae Suwon-si, KR 4 10
Kim, Tae-Yoo Suwon-si, KR 6 10
Lee, Changhyoung Gyeongsan-si, KR 1 3
Lee, Jungwoo Suwon-si, KR 130 1253
Lee, Mi-Ri Suwon-si, KR 48 617
Park, Jung-Ho Seoul, KR 70 477
Park, Jung-Kab Suwon-si, KR 6 10
Shin, Jin-Ha Siheung-si, KR 7 10
Son, Hwa-Jin Suwon-si, KR 5 10
Song, Young-Il Suwon-si, KR 11 89
Suh, Su-Jeong Suwon-si, KR 4 3
Yun, Sook-Young Seongnam-si, KR 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00