Method for converting energy with fuel regeneration in a cyclic process of a heat engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850784
SERIAL NO

14901717

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the method for conversion with recovery of energy carriers in a cyclical process of a thermal engine, a first recirculation cycle is formed involving gas generator, device for converting kinetic and thermal energy into mechanical energy, hydrogenation reactor, and gas generator. Water is evaporated in steam boilers, and steam is fed into turbine for converting steam energy into mechanical energy. In this process, steam boilers are located in gas generator and in hydrogenation reactor. The steam is carried onward from conversion device into condenser, and a second recirculation cycle is formed. Atmospheric oxygen from an air bubble is supplied to gas generator. The air is cooled, and cooling operation is repeated, until a maximum residual water content in the air of 0.2 g/m3 is attained. Formed condensate is collected and used steam boilers. Invention makes it possible to simplify process of recovering carbon oxides formed in thermal engines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BARCHAN GENNADIJ PAVLOVICHRUSSIA LOBNYA MOSCOW MOSCOW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barchan, Gennadij Pavlovich Lobnya Moskovskaya obl., RU 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00