Controller of internal combustion engine with supercharger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850874
SERIAL NO

14386385

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller of an engine with a supercharger includes, for each of cylinders, fuel supply system and an ignition plug. The controller includes an electronic control unit that is configured to: (i) set a basic ignition timing depending on an operation state of the engine, (ii) detect, for each cycle, an abnormal combustion generation cylinder in which an abnormal combustion is generated in a supercharged region, (iii) execute a fuel cut to stop a fuel supply by the fuel supply system for the abnormal combustion generation cylinder, (iv) change an ignition timing of the abnormal combustion generation cylinder to expand a crank angle width between a compression top dead center and the basic ignition timing for several cycles after start of the fuel cut, and (v) execute an ignition cut that prohibits a spark from being generated by the ignition plug, further after elapse of the several cycles is executed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Demura, Takayuki Mishima, JP 32 326
Ooi, Yasuhiro Numazu, JP 8 54
Yuda, Syuuji Gotemba, JP 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00