Spent flow discharge apparatus for an instream fluid power-extraction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850877
SERIAL NO

14494296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid power-extraction machine is immersed in an ambient flow of a fluid, captures (and extracts energy from) a portion of the fluid, and discharges it back into the ambient flow. The machine includes a housing bounding a fluid intake inlet and including an ambient flow deflector, a downstream body arranged rearwardly from the deflector and forming a discharge outlet between the deflector and the downstream body, and a power extraction device in a fluid flow channel communicating from the fluid intake inlet to the discharge outlet. The deflector outwardly deflects and accelerates a portion of the ambient flow adjacent to the discharge outlet. A mixing surface of the downstream body extends outwardly and rearwardly from the discharge outlet, mixing the accelerated flow, the discharged flow and the ambient flow together along the mixing surface. A backflow preventer of the downstream body prevents wake backflow from impeding discharge of spent flow at the discharge outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCBRIDE GEORGE FNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McBride, George F Machiasport, US 2 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00