Chemical sensitivity screening test

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851346
SERIAL NO

14966232

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present document describes a screening composition comprising a marker compound, chosen from at least one of iodine, and fluorescein; eosin Y, erythrosine, ponceau S, calcein, a catalyst, chosen from at least one boron trioxide (B2O3), potassium (K), Gallium (III) oxide (Ga2O3), Nickel (II) oxide (NiO), Vanadium (V) oxide (V2O5), magnesium oxide (MgO), a bismuth oxide chosen from bismuth subcarbonate [Bi2O2(CO3)], bismuth chloride oxide (BiClO), and bismuth oxide (Bi2O3), cesium bromide (CsBr), lanthanum (III) oxide (La2O3), molybdenum (VI) oxide (MoO3), neodymium oxide (Nd2O3), Nickel (II) carbonate anhydrous (NiCO3); and a pigment, chosen from at least one of scandium (III) oxide (Sc2O3), Lead (IV) oxide (PbO2), Sulfur (S) powder, and Tungsten (VI) oxide (WO3), chromium (III) oxide (Cr2O3), copper (II) oxide (CuO), copper (I) oxide (Cu2O), iron (III) oxide (Fe2O3), lead (II) oxide (PbO). The document also describes method of using the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRYSON PATENTS INCKING CITY ON L7B 1K4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Farnum, Bryan Christopher King City, CA 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00