Zoom lens and image pickup apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851582
SERIAL NO

14827781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a zoom lens, comprising, in order from an object side to an image side, first to fourth lens units having positive, negative, positive, and positive refractive powers. During zooming, first lens unit does not move, and second to fourth lens units move. Third lens unit comprises, in order from the object side to the image side, first and second lens subunits each having a positive refractive power. Second lens subunit moves in a direction having a component of a direction perpendicular to an optical axis during image blur correction. Third lens unit comprises at least two positive lenses and at least two negative lenses. Second lens subunit comprises a positive lens and a negative lens. A focal length (f2) of second lens unit, a focal length (f3) of third lens unit, and a focal length (f3b) of second lens subunit are each appropriately set.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyazawa, Nobuyuki Utsunomiya, JP 31 179

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00