Backside contact to a final substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9852944
SERIAL NO

15274406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Device structures and fabrication methods for a backside contact to a final substrate. An electrically-conducting connection is formed that extends through a device layer of a silicon-on-insulator substrate and partially through a buried insulator layer of the silicon-on-insulator substrate. After the electrically-conducting connection is formed, a handle wafer of the silicon-on-insulator substrate is removed. After the handle wafer is removed, the buried insulator layer is partially removed to expose the electrically-conducting connection. After the buried insulator layer is partially removed, a final substrate is coupled to the buried insulator layer such that the electrically-conducting connection is coupled with the final substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gambino, Jeffrey P Portland, US 531 7321
Jaffe, Mark D Shelburne, US 146 2257
Shank, Steven M Jericho, US 217 838
Stamper, Anthony K Williston, US 613 6570

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00