Systems and methods for coordinating electrical network optimization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853448
SERIAL NO

13352227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a system includes a coordinated distribution optimization (CDO) system. The CDO system includes a processor configured to coordinate execution of a plurality of independent electrical network applications. Each of the plurality of independent electrical network applications is configured to alter one or more operational parameters of a power grid based on one or more respective objectives and based on power grid operational data, and the execution of the plurality of independent electrical network applications is coordinated by the CDO system to block the power grid from entering an abnormal state. The CDO system further comprises a network interface configured to receive the power grid operational data from a controller of the power grid, and wherein the power grid operational data comprises current values for the one or more operational parameters of the power grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Backscheider, Paul Mosman, AU 1 8
Fan, Hua Norcross, US 59 254
Fan, Jiyuan Duluth, US 16 58
McDonald, John Douglas Duluth, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00