Connecting electrical storage devices in parallel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853465
SERIAL NO

13402622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit and a method for connecting a first electrical storage device and a second electrical storage device in parallel is disclosed. The first electrical storage device and the second electrical storage device have in each case a no-load voltage UBat1, UBat2 and an impedance R1 and R2, respectively, and have connecting terminals for charge withdrawal or charge supply. The no-load voltage UBat1 of the first storage device is greater than the no-load voltage UBat2 of the second storage device. In the case of a charge withdrawal, a charge is initially only withdrawn from the first storage device and the second storage device is connected in parallel with the first storage device when the difference of the voltage dropped across the connecting terminals of the first storage device and the no-load voltage UBat2 of the second storage device is less than a predetermined differential add-on voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORQEEDO GMBHFRIEDRICHSHAFENER STRASSE 4A GILCHING 82205

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biebach, Jens Tutzing, DE 25 74
Boebel, Friedrich Eurasburg, DE 9 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00