Package substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9854669
SERIAL NO

14953141

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A printed wiring board includes a first insulating layer, a first conductor layer formed on first surface of the first insulating layer, a second conductor layer formed on second surface of the first insulating layer, a first via structure formed in the first insulating layer such that the first via structure is connecting the first and second conductor layers, a second insulating layer formed on the second surface of the first insulating layer such that the second conductor layer is embedded into the second insulating layer, a third conductor layer formed on the second insulating layer, and a second via structure formed in the second insulating layer such that the second via structure is connecting the second and third conductor layers. The second conductor layer includes a dedicated wiring layer which transmits data between two electronic components to be mounted to the first surface of the first insulating layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBIDEN CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furutani, Toshiki Ogaki, JP 99 890
Inagaki, Yasushi Ogaki, JP 61 1137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00