Material with high resistance to wear

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855603
SERIAL NO

13888862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Material and method for the production of material with isotropic, mechanical properties and improved wear resistance and high hardness potential. Method includes producing in a powder metallurgical (PM) method a slug or ingot from a material of ledeburite tool steel alloy, and subjecting one of the slug or ingot or a semi-finished product produced from the slug or ingot to full annealing at a temperature of over 1100° C., but at least 10° C. below the fusing temperature of the lowest melting structure phase with a duration of over 12 hrs. In this manner, an average carbide phase size of the material is increased by at least 65%, a surface shape of the material is rounded and a matrix is homogenized. Method further includes subsequently processing the material into thermally tempered tools with high wear resistance occurs or into parts to which abrasive stress is applied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOEHLER EDELSTAHL GMBH & CO KGMARIAZELLERSTR 25 KAPFENBERG 8605

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caliskanoglu, Devrim Giessen, DE 10 19
Kellezi, Gert Leoben, AT 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00