Regenerating method of cutting blade, its regenerating equipment, and cutting blade for shearing type grinding machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855627
SERIAL NO

13761556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A regenerating method of a cutting blade to be repaired includes a chamfering step of chamfering a leading edge part and side edge parts of a cutting blade, a build-up welding step of welding a build-up on the chamfered leading edge part and the chamfered side edge parts, and a processing step of regenerating and processing build-up welding portions of the cutting blade into a specified shape of the leading edge part and the side edge parts, and of the build-up welding portions formed on the side edge parts, such that a dimension L1 of a lateral build-up weld zone is 1 to 3 times a dimension L2 of an outer build-up weld zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KINKIKOBE-SHI HYOGO 650-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azui, Yoshinobu Hyogo, JP 2 9
Honda, Yasuhiko Hyogo, JP 53 568
Matsumoto, Katsu Hyogo, JP 4 22
Nagai, Isao Hyogo, JP 11 317
Takami, Keita Hyogo, JP 2 9
Takemoto, Natsuki Hyogo, JP 4 22
Wada, Naoya Hyogo, JP 69 282
Yasukawa, Tetsuo Hyogo, JP 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00