Thrust bearing and bearing device for crankshaft of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856908
SERIAL NO

14967800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thrust bearing for receiving an axial force of a crankshaft of an internal combustion engine. The thrust bearing includes a pair of half thrust bearings having a semi-annular shape that form an annular shape by abutting their circumferential end surfaces. Each half thrust bearing include thrust reliefs formed adjacent to both circumferential end portions of a sliding surface receiving the axial force so that a wall thickness is thinner toward the circumferential end surface. A thrust relief length L2 at an inner end portion of the thrust relief positioned on a rear side of one of the half thrust beings in a rotational direction is larger than a thrust relief length L1 at an inner end portion of the thrust relief positioned on a front side of the other of the half thrust bearing in the rotational direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIDO METAL COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ozawa, Yoshihiro Inuyama, JP 18 187
Tanaka, Shiho Inuyama, JP 35 198

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00