Global branch prediction using branch and fetch group history

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9858081
SERIAL NO

13964456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure includes a method for performing branch prediction by a processor having an instruction pipeline. The processor speculatively updates a global history register having fetch group history and branch history, fetches a fetch group of instructions, and assigns a global history vector to the instructions. The processor predicts any branches in the fetch group using the global history vector and a predictor, and evaluates whether the fetch group contains a predicted taken branch. If the fetch group contains a predicted taken branch, the processor flushes subsequently fetched instructions in the pipeline following the predicted taken branch, repairs the global history register to the global history vector, and updates the global history register based on branch prediction information. If the fetch group does not contain a predicted taken branch, the processor updates the global history register with a branch history value for each branch in the fetch group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heil, Timothy H Sammamish, US 27 741
Hilton, Andrew D Durham, US 12 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00