Tamper-respondent assembly with nonlinearity monitoring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9858776
SERIAL NO

15194738

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Tamper-respondent assemblies and methods of fabrication are provided which include at least one tamper-respondent sensor and a detector. The at least one tamper-respondent sensor includes conductive lines which form, at least in part, at least one tamper-detect network of the tamper-respondent sensor(s). The detector monitors the tamper-respondent sensor(s) by applying an electrical signal to the conductive lines of the at least one tamper-respondent sensor to monitor for a non-linear conductivity change indicative of a tamper event at the tamper-respondent sensor(s). For instance, the detector may monitor a second harmonic of the electrical signal applied to the conductive lines for the non-linear conductivity change indicative of the tamper event, such as an attempted shunt of one or more conductive lines of the tamper-respondent sensor(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Busby, James A New Paltz, US 46 573
Isaacs, Phillip Duane Rochester, US 31 849

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00