Process for producing composite material of metal oxide with conductive carbon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859035
SERIAL NO

14425298

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method whereby metal oxide nanoparticles having evenness of size are efficiently and highly dispersedly adhered to conductive carbon powder. This method comprises: a preparation step in which a reaction solution containing water, a compound with a transition metal selected from the group consisting of Mn, Fe, Co, and Ni, and conductive carbon powder and having a pH in the range of 9 to 11 is introduced into a rotatable reactor; a supporting step in which the reactor is rotated to apply shear stress and centrifugal force to the reaction solution, thereby yielding a core of a hydroxide of the transition metal and dispersing the thus-yielded core of a hydroxide of the transition metal and the conductive carbon powder and simultaneously supporting the hydroxide of the transition metal by the conductive carbon powder; and a heat treatment step in which the conductive carbon powder loaded with the hydroxide of the transition metal is heated to thereby convert the hydroxide supported by the conductive carbon powder into an oxide nanoparticle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON CHEMI-CON CORPORATION5-6-4 OSAKI SHINAGAWA-KU TOKYO 141-8605

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishimoto, Shuichi Tokyo, JP 42 280
Kubota, Satoshi Tokyo, JP 136 1095
Naoi, Katsuhiko Fuchu, JP 43 968
Naoi, Wako Kunitachi, JP 26 117
Tamamitsu, Kenji Tokyo, JP 35 162
Yonekura, Daisuke Tokyo, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00