Methods for forming hybrid vertical transistors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859301
SERIAL NO

15177941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a hybrid semiconductor device includes growing a stack of layers on a semiconductor substrate. The stack of layers includes a bottom layer in contact with the substrate, a middle layer on the bottom layer and a top layer on the middle layer. First and second transistors are formed on the top layer. A protective dielectric is deposited over the first and second transistors. A trench is formed adjacent to the first transistors to expose the middle layer. The middle layer is removed from below the first transistors to form a cavity. A dielectric material is deposited in the cavity to provide a transistor on insulator structure for the first transistors and a bulk substrate structure for the second transistors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balakrishnan, Karthik White Plains, US 335 2038
Cheng, Kangguo Schenectady, US 3073 29791
Hashemi, Pouya White Plains, US 600 4483
Reznicek, Alexander Troy, US 1408 11211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00