SiC-based superjunction semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859361
SERIAL NO

15016680

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a semiconductor body having a semiconductor body material with a dopant diffusion coefficient that is smaller than the corresponding dopant diffusion coefficient of silicon, at least one first semiconductor region doped with dopants of a first conductivity type and having a columnar shape that extends into the semiconductor body along an extension direction, wherein a respective width of the at least one first semiconductor region continuously increases along the extension direction; and at least one second semiconductor region included in the semiconductor body. The at least one second semiconductor region is arranged adjacent to the at least one first semiconductor region, and is doped with dopants of a second conductivity type complementary to the first conductivity type.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INFINEON TECHNOLOGIES AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jantscher, Wolfgang Villach, AT 17 50
Rupp, Roland Lauf, DE 189 1634
Schulze, Hans-Joachim Taufkirchen, DE 682 3901
Schustereder, Werner Villach, AT 64 212
Weber, Hans Bayerisch Gmain, DE 158 924

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00