Semiconductor device with reduced emitter efficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859378
SERIAL NO

15182720

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a semiconductor device includes providing a semiconductor body having a front side 10-1 and a back side, wherein the semiconductor body includes a drift region having dopants of a first conductivity type and a body region having dopants of a second conductivity type complementary to the first conductivity type, a transition between the drift region and the body region forming a pn-junction. The method further comprises: creating a contact groove in the semiconductor body, the contact groove extending into the body region along a vertical direction pointing from the front side to the back side; and filling the contact groove at least partially by epitaxially growing a semiconductor material within the contact groove, wherein the semiconductor material has dopants of the second conductivity type.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INFINEON TECHNOLOGIES AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baumgartl, Johannes Riegersdorf, AT 42 149
Komarnitskyy, Volodymyr Villach, AT 5 55
Wagner, Wolfgang Villach, AT 127 1583

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00