Sidewall protective layer for contact formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859389
SERIAL NO

15193404

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a semiconductor device comprises forming a sacrificial gate stack on a substrate, spacers adjacent to the sacrificial gate stack, and a source/drain region on the substrate. A first insulator layer is formed on the source/drain region. A portion of the first insulator layer is removed to expose portions of the spacers. Exposed sidewall portions of the spacers are removed to reduce a thickness of the exposed portions of the spacers. A protective layer is deposited over the exposed sidewalls of the spacers and a second insulator layer is deposited over the protective layer. The sacrificial gate is removed to expose a channel region of the substrate. A gate stack is formed over the channel region of the substrate. Exposed portions of the first insulator layer and the second insulator layer are removed to expose the source/drain region, and a conductive is formed on the source/drain region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29791
Miao, Xin Guilderland, US 355 2275
Xu, Wenyu Albany, US 190 937
Zhang, Chen Guilderland, US 671 2866

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00