End plate for an electric machine, electric machine and method for assembling an electric machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859769
SERIAL NO

14404264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An end plate for an electric machine includes: a bearing receptacle in which a magnetic bearing which is configured for rotatably mounting a rotor of the electric machine can be accommodated; and a radially outwardly pointing circumferential contour on which a number of at least three supporting elements are provided, which supporting elements each protrude radially beyond the circumferential contour by a determined protruding amount, with the result that the supporting elements define a discontinuous external circumferential contour of the end plate. The respective protruding amounts of the support elements are dimensioned such that the end plate can be fitted in by making a center of the magnetic bearing correspond to at least one of a geometric longitudinal axis of the electric machine and a magnetic longitudinal axis of the electric machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAN ENERGY SOLUTIONS SE86153 AUGSBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dettwyler, Markus Pfaeffikon, CH 1 0
Kabs, Gino Landikon, CH 1 0
Kleynhans, George Buelach, CH 8 73
Vetter, Marcel Zuerich, CH 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00