Priority management of a measurement event timer and low-power period

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9860804
SERIAL NO

14537563

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, apparatuses, and devices are described for transmitting a measurement report during wireless communications. When, for example, a low-power period (e.g., CDRX OFF period) is scheduled to begin during a time defined by a measurement event timer (TTT timer), a UE may modify the low-power period. The low-power period may be modified based, at least in part on determining the low-power period of the UE will begin during a time defined by a measurement event timer, a duration of the measurement event timer, and a duration of the low-power period. Modifying the low-power period may include delaying the start of the low-power state until after transmission of the MR associated with the measurement event timer or skipping the low-power period altogether. The UE may transmit the MR based, at least in part, on the modification.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alrabadi, Osama Nafeth Saleem Bad Soden am Taunus, DE 3 12
Bhawnani, Udayan Murli San Diego, US 7 78
Bressanelli, Dominique Francois Eschborn, DE 17 79
Choi, Won-Joon San Diego, US 87 1545
Khalifa, Mohamed Frankfurt Hessen, DE 9 32
Kumar, Vishu Hyderabad, IN 6 16
Madan, Marian Bad Soden am Taunus, DE 5 20
Mahajan, Amit Sunnyvale, US 71 1133
Prisecaru, Florina Andreea Frankfurt Hessen, DE 1 3
Srinivasan, Shivratna Giri Chennai, IN 15 151
Wu, Yongle San Diego, US 70 114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00