Electrical connection of electrical wires to flexible conductive elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9860982
SERIAL NO

15442699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process makes electrical connections between electrical wires and flexible conductive elements, such as conductive fabrics. The process makes strong electrical connections that are mechanically flexible and can simultaneously create multiple electrical connections. The process involves creating an assembly that includes at least a TPE layer, an electrical wire, an insulating layer, and a flexible conductive element, and applying heat and pressure to the assembly. For example, a conductive fabric is disposed on an insulating layer, a wire is positioned onto a surface of the insulating layer, and a TPE layer is disposed over the wire and overlaps the conductive fabric element. When applying the heat and pressure, the wire melts through the insulating layer to make electrical contact with the conductive fabric element, and the TPE layer conforms to an exterior of the wire and bonds to the insulating layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XSENSOR TECHNOLOGY CORPORATION133 12 AVENUE SE CALGARY AB T2G 0Z9

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gorjanc, Timothy Carl Calgary, CA 4 133
Main, Ian Calgary, CA 27 466

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00