Preparation of catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9861963
APP PUB NO 20140183098A1
SERIAL NO

14132741

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a hydrocarbon conversion catalyst that comprises a specially made silica-alumina composition and a metal or metal compound selected from Group VIB and Group VIII metals. The silica-alumina composition is made by preparing an aqueous mixture containing aluminum sulfate followed by adding alkali metal aluminate to the mixture to inhance the pH to within specified range and then adding aluminum sulfate to the mixture to lower the pH. Then alkali metal silicate is added followed by several other pH swings to provide a mixture containing silica-alumina. The resulting mixture is treated with an alkaline solution to provide a precipitate solid that is recovered to obtain a silica-alumina composition containing of from 30 to 70% wt silica and of from 70 to 30% wt of alumina.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alkema, Sjoerd Delfzil, NL 3 20
Cooper, David Allen Morrisville, US 11 39
Domokos, Laszlo Amsterdam, NL 12 239
Ong, Lay Hwa Amsterdam, NL 7 25
Pelgrim, Bart Amsterdam, NL 7 26
Winter, Ferry Amsterdam, NL 33 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00