Control unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862366
SERIAL NO

15151976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake system (1) for a commercial vehicle (100) with a trailer includes a trailer control valve (24), a supply pressure line (46), a control pressure line (44), a valve arrangement for selectively connecting either the supply pressure line (46) or the control pressure line (44) to the trailer control valve (24), and an electronic control unit (10) that is arranged to perform electronic brake control. The valve arrangement is embodied as a structural valve unit (40), that can be switched by the electronic control unit (10) between the switching states connecting a trailer-side pressure line (52) to the control pressure line (44), and connecting the trailer-side pressure line (52) to the supply pressure line (46), and is arranged to subject the trailer-side pressure line (52) to a control pressure in a brake control situation depending on corresponding commands of the electronic control unit (10).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZF CV SYSTEMS EUROPE BV1170 BRUSSELS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiel, Bernd-Joachim Wunstorf, DE 23 338

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00