Methods and systems for the co-generation of gaseous fuels, biochar, and fertilizer from biomass and biogenic wastes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862610
SERIAL NO

14237701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for converting a biomass and biogenic wastes to hydrogen with integrated carbon dioxide capture and storage are disclosed. In some embodiments, the methods include the following: mixing at least one of a dry solid or liquid or liquid hydroxide and catalysts with a biomass to form a biomass mixture; heating the biomass mixture until the hydroxide and the biomass react to produce hydrogen, carbonate, biochar, and potentially fertilizer; calcining the carbonate or performing double replacement reactions of the carbonate to produce sequestration-ready carbon dioxide and a hydroxide; storing the carbon dioxide produced; transferring the hydrogen produced to a fuel cell; and generating electricity with the fuel cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK412 LOW MEMORIAL LIBRARY 535 WEST 116TH STREET MAIL CODE 4308 NEW YORK NY 10027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferguson, Thomas E Brooklyn, US 1 1
Park, Ah-Hyung Alissa New York, US 16 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00