High-performance NdFeB rare earth permanent magnet with composite main phase and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863021
SERIAL NO

14708997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A NdFeB rare earth permanent magnet with composite main phase and a manufacturing method thereof are provided. In the composite main phase, a PR2(Fe1-x-yCoxAly)14B main phase is the core, ZR2(Fe1-w-nCowAln)14B main phase surrounds a periphery of the PR2(Fe1-x-yCoxAly)14B main phase, and no grain boundary phase exists between ZR2(Fe1-w-nCowAln)14B main phase and the PR2(Fe1-x-yCoxAly)14B main phase, wherein ZR represents a group of rare earth elements in which a content of heavy rare earth is higher than an average content of heavy rare earth in the composite main phase, PR represents a group of rare earth elements in which a content of heavy rare earth is lower than an average content of heavy rare earth in the composite main phase. The manufacturing method includes steps of LR—Fe—B-Ma alloy melting, HR—Fe—B-Mb alloy melting, alloy hydrogen decrepitating, metal oxide micro-powder surface absorbing and powdering, magnetic field pressing, sintering and ageing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENYANG GENERAL MAGNETIC CO LTDSHENYANG LIAONING 110179

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Baoyu Liaoning, CN 24 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00