Ferritic stainless steel and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863023
SERIAL NO

14437015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a ferritic stainless steel having a corrosion resistance at a certain level or more and a temper-color removal performance at a certain level or more and a method for manufacturing the ferritic stainless steel. A ferritic stainless steel has a composition containing, by mass %, C: 0.001% to 0.030%, Si: 0.03% to 0.30%, P: 0.05% or less, S: 0.01% or less, Cr: more than 22.0% to 28.0%, Mo: 0.2% to 3.0%, Al: 0.01% to 0.15%, Ti: more than 0.30% to 0.80%, V: 0.001% to 0.080%, and N: 0.001% to 0.050%; Mn: 0.05% to 0.30% and Ni: 0.01% to 5.00%, or Mn: 0.05% to 2.00% and Ni: 0.01% to 0.30%; Nb: 0.05% or less as an optional component; and the balance being Fe and inevitable impurities, and the steel has a surface where TiN having a grain diameter of 1 μm or more is distributed at a density of 30 particles/mm2 or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Tomohiro Chiba, JP 104 1127
Ishikawa, Shin Chiba, JP 80 311
Ogata, Hiroyuki Chiba, JP 44 298
Ota, Hiroki Chiba, JP 85 338

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00