Combined cycle power plant system and related control systems and program products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863286
SERIAL NO

14281335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments include a system having: at least one computing device configured to monitor a combined-cycle (CC) power plant during a transient event by performing actions including: determining whether a change in an operating condition of a component of the CC power plant is unintentional, the determining including comparing control system instructions for the component of the CC power plant with a reference look-up table, the reference look-up table including correlation data for the control system instructions for the component and historical data about the operating condition of the component; and providing instructions to a control system of the CC power plant to modify the operating condition in the CC power plant in response to determining that the change in operating condition of the component is unintentional.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seely, William Forrester Taylors, US 29 74
Tiwari, Awadesh Kumar Bangalore, IN 20 281

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00