Control device for internal combustion engine and control method for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863347
SERIAL NO

15131068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The control device includes an operation state detector, an intake manifold pressure detector, an air humidity detector, an air temperature detector, an atmospheric pressure detector, and a controller that controls the engine output on the basis of detection results of the detectors. The controller generates humidity information on the air which is taken in by the internal combustion engine, from the humidity, temperature, and atmospheric pressure, calculates a dry air partial pressure by correcting the pressure detected by the intake manifold pressure detector, by using the humidity information, and controls the engine output by taking the pressure detected by the intake manifold pressure detector as a wet air pressure and selecting, according to a control element, either one of the wet air pressure and the dry air partial pressure as a pressure to be used for the engine output control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hagari, Hideki Hyogo, JP 60 527
Yokono, Michihisa Hyogo, JP 17 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00