FIFO-based operations for redundant array of independent disks (RAID) device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9864546
SERIAL NO

15059758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses and methods for modifying data stored on a disk are provided. A buffer comprises a FIFO queue. The FIFO queue includes a plurality of buffer lines for queuing data units in a predetermined order. A controller is configured to write data units from the disk to respective buffer lines of the FIFO queue. The controller is further configured to perform read-modify-write (RMW) operations to modify the data units written to the queue. Each RMW operation includes (i) popping a data unit from a buffer line of the queue based on a location of a read pointer, (ii) performing a mathematical or logic operation to modify the data unit that is popped from the queue, and (iii) pushing the modified data unit into the queue. The modified data unit is written to a buffer line of the queue based on a location of a write pointer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ISRAEL (M I S L) LTD6 HAMADA STREET MORDOT HACARMEL INDUSTRIAL PARK YOKNEAM 20692

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kovishaner, Gregory Ramat-Gan, IL 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00