Metallic blocking layer for reliable interconnects and contacts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865538
SERIAL NO

15065226

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor structure is provided that includes a first interconnect dielectric layer containing a first interconnect metal structure embedded therein. A second interconnect dielectric layer containing a second interconnect metal structure embedded therein is located atop the first interconnect dielectric layer. A metallic blocking layer is present that separates a surface of the second interconnect metal structure from a surface of the first interconnect metal structure. The metallic blocking layer has a lower resistivity than the first and second interconnect metal structures. The metallic blocking layer prevents electromigration of metallic ions from the first and second interconnect metal structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adusumilli, Praneet Albany, US 163 779
Reznicek, Alexander Troy, US 1406 11101
van, der Straten Oscar Guilderland Center, US 171 865
Yang, Chih-Chao Glenmont, US 1030 7486

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00