Transistor with deep Nwell implanted through the gate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865599
SERIAL NO

14614733

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fabricating a CMOS integrated circuit (IC) includes implanting a first n-type dopant at a first masking level that exposes a p-region of a substrate surface having a first gate stack thereon to form NLDD regions for forming n-source/drain extension regions for at least a portion of a plurality of n-channel MOS (NMOS) transistors on the IC. A p-type dopant is implanted at a second masking level that exposes an n-region in the substrate surface having a second gate stack thereon to form PLDD regions for at least a portion of a plurality of p-channel MOS (PMOS) transistors on the IC. A second n-type dopant is retrograde implanted including through the first gate stack to form a deep nwell (DNwell) for the portion of NMOS transistors. A depth of the DNwell is shallower below the first gate stack as compared to under the NLDD regions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TEXAS INSTRUMENTS INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nandakumar, Mahalingam Richardson, US 103 781

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00