Double shutter shroud and tunnel for MCC bus connections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9865997
SERIAL NO

15032669

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A double shutter shroud (5) and a flexible sheath (11) surrounding a stab (10) of an MCC unit, form a protective tunnel (30) for the stab to connect to a bus 4. A first shroud (6) mounted on the bus, includes a first gate (12). A second shroud (20) mounted on the MCC unit includes a second gate (24). When the MCC unit slides into an MCC section, a unit key (16) opens the first gate. When the stab is advanced toward the bus, a stab key (28) opens the second gate, forming a protective tunnel (30) from the flexible sheath and through the first and second shrouds. The protective tunnel protects the stab and bus from contamination, helps prevent dielectric breakdowns and short circuits between different phase busses, and protects an operator from electrical hazard of touching the bus or stab with tools or fingers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SCHNEIDER ELECTRIC USA, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becerra, Becerra Manuel Antonio Apodaca, MX 4 33
Cordova, Urbiola Arturo Javier Monterrey, MX 2 15
Espinosa, Gutierrez Victor Daniel San Nicolas de los Garza, MX 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00