Transitioning a power supply from a mode to another mode in response to a length of a portion of a current pulse

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866114
SERIAL NO

14479112

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a power-supply controller includes a switching circuit and a transition circuit. The switching circuit is configured to generate a regulated output voltage by generating first current pulses at an approximately fixed frequency during a first mode, and generating second current pulses at a variable frequency during a second mode. And the transition circuit is configured to transition the switching circuitry from the first mode to the second mode in response to a length of one of the first current pulses. For example, a power supply may include such a power-supply controller to transition the supply from a PWM mode to a PFM mode under light-load conditions. To cause this transition at a predictable load point, the controller may monitor the lengths of the current pulses during the PWM mode, and may transition the supply to a PFM mode in response to the lengths being below a threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERSIL AMERICAS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Archibald, Nicholas San Francisco, US 8 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00