Cooling apparatus for switchgear with heat pipe structure having integrated busbar tube

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9867316
SERIAL NO

14376634

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling apparatus is provided for a switchgear. The switchgear has one or more primary contacts constructed and arranged to connect to a terminal of a circuit breaker. The cooling apparatus includes an evaporator constructed and arranged to be associated with each primary contact. A condenser is located at a higher elevation than the evaporator. Fluid conduit structure fluidly connects the evaporator with the condenser. A portion of the fluid conduit structure defines a busbar tube electrically connected with an associated primary contact and defining a busbar of the switchgear. Working fluid is in the evaporator so as to be heated to a vapor state, with the fluid conduit structure being constructed and arranged to transfer the vapor to the condenser and to passively return condensed working fluid back to the evaporator for cooling the at least one primary contact and the associated busbar tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB SCHWEIZ AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buehler, Tilo Othmarsingen, CH 7 46
Kaufmann, Patrik Baden, CH 10 35
Schuler, Gabriel Arth, CH 2 13
Unternaehrer, Peter Wurenlos, CH 4 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00