Stripping absorption module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9868076
APP PUB NO 20160256796A1
SERIAL NO

15158048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a process, a portion of a liquid mixture flow is vaporized to produce a vapor and a depleted flow of liquid. The vapor is introduced to a brine which is adapted to exothermically absorb one or more components therefrom, and heat is withdrawn, to produce at least a flow of heat and a flow of brine which is enriched in the one or more components. The heat previously withdrawn is transferred, to drive the vaporization. This transfer can be associated with the change of a working fluid from a gaseous into a liquid gate. In this case, the heat withdrawal involves the change of the working fluid from the liquid to the gaseous state. In the liquid state, the working thud flows only by one or more of gravity, convection and wicking. In the gaseous state, the working fluid flows only by one or more of diffusion and convection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DRYSTILL HOLDINGS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belchers, Christopher H Oakville, CA 6 22
McGregor, Ian R Mississauga, CA 8 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00