Combustion burner and boiler including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869469
SERIAL NO

14810897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion burner 1 includes a fuel nozzle 2 that injects fuel gas prepared by mixing solid fuel and primary air, secondary air nozzles 3, 4 that inject secondary air from the outer periphery of the fuel nozzle 2, and a flame holder 5 that is arranged in an opening of the fuel nozzle 2. In the combustion burner 1, the flame holder 5 has a splitting shape that widens in the flow direction of the fuel gas. When seen in cross section along a direction in which the flame holder 5 widens, the cross section passing through the central axis of the fuel nozzle 2, a maximum distance h from the central axis of the fuel nozzle 2 to the widened end of the flame holder 5 and an inside diameter r of the opening 21 of the fuel nozzle 2 satisfy h/(r/2)<0.6.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Naofumi Tokyo, JP 12 55
Domoto, Kazuhiro Tokyo, JP 23 70
Fujimura, Koutaro Tokyo, JP 15 99
Ichinose, Toshimitsu Tokyo, JP 16 159
Kasai, Jun Tokyo, JP 25 76
Matsumoto, Keigo Tokyo, JP 60 302

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00