Process energy intensity monitoring and diagnostic system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870592
SERIAL NO

14218941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Process Energy Intensity Monitoring and Diagnostic System designed to evaluate the amount of energy input into a process and the resulting product output, and comparing the resulting energy intensity (energy per unit produced) calculation with a statistical average, or preferred value. Further, the system will isolate energy intensity data points that occur outside statistically derived upper or lower control limits. The system will collect information from specific equipment within a manufacturing or production process. This information will be transmitted to the central database that will store, calculate, and deliver real time and historical consumption, production, and energy intensity data to connected client devices. Client devices may include computers, smartphones, or web browsers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANTECH INDUSTRIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmadi, Majid San Diego, US 6 100
Leishman, Andrew Mission Viejo, US 3 13
Riddar, Cody San Diego, US 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00