Global bit line pre-charge circuit that compensates for process, operating voltage, and temperature variations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9870823
SERIAL NO

15596499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory array includes wordlines, local bitlines, two-terminal memory elements, global bitlines, and local-to-global bitline pass gates and gain stages. The memory elements are formed between the wordlines and local bitlines. Each local bitline is selectively coupled to an associated global bitline, by way of an associated local-to-global bitline pass gate. During a read operation when a memory element of a local bitline is selected to be read, a local-to-global gain stage is configured to amplify a signal on or passing through the local bitline to an amplified signal on or along an associated global bitline. The amplified signal, which in one embodiment is dependent on the resistive state of the selected memory element, is used to rapidly determine the memory state stored by the selected memory element. The global bit line and/or the selected local bit line can be biased to compensate for the Process Voltage Temperature (PVT) variation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNITY SEMICONDUCTOR CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bateman, Bruce Lynn Fremont, US 21 158
Siau, Chang Hua Saratoga, US 70 1526

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00