LPS architecture for UPS systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871409
SERIAL NO

14893796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect, embodiments herein provide a UPS comprising a transformer including a first primary winding configured to be coupled to a DC source, a second primary winding configured to be coupled to an AC source, and at least one secondary winding, control logic, and at least one output line, wherein the control logic is configured, in a first mode of operation, to enable the first primary winding to generate, based on power received from the DC source, a first output voltage at the at least one output line, and to disable the second primary winding, and wherein the control logic is configured, in a second mode of operation, to enable the second primary winding to generate, based on power received from the AC source, a second output voltage at the at least one output line, and to disable the first primary winding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC IT CORPORATION70 MECHANIC STREET FOXBORO MA 02035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ghosh, Rajesh Bangalore, IN 33 670
Klikic, Damir Waltham, US 45 1194
Lipare, Mahendrakumar H Bangalore, IN 7 97

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00