Power source switching device and storage battery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871460
SERIAL NO

14891347

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A third relay switches between an output of a first AC power source fed via a first relay and an output of a second AC power source fed via a second relay, and supplies the output after the switching to a load. A welding detection unit detects welding of the first relay. In order to switch the output of the first AC power source to the output of the second AC power source and supply the output of the second AC power source to the load, a power source switching control unit switches the first relay from the closed state to the open state, switches the third relay so as to select and feed the output of the second AC power source, and then prohibits switching of the second relay from the open state to the closed state until a first-relay welding detection processing by the welding detection unit is completed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kubo, Masahiko Hyogo, JP 112 860
Kuranuki, Masaaki Kyoto, JP 29 427

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00