Service interface for QOS-driven HPNA networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871739
SERIAL NO

14959852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An in-band signaling model media control (MC) terminal for an HPNA network includes a frame classification entity (FCE) and a frame scheduling entity (FSE) and provides end-to-end Quality of Service (QoS) by passing the QoS requirements from higher layers to the lower layers of the HPNA network. The FCE is located at an LLC sublayer of the MC terminal, and receives a data frame from a higher layer of the MC terminal that is part of a QoS stream. The FCE classifies the received data frame for a MAC sublayer of the MC terminal based on QoS information contained in the received data frame, and associates the classified data frame with a QoS stream queue corresponding to a classification of the data frame. The FSE is located at the MAC sublayer of the MC terminal, and schedules transmission of the data frame to a destination for the data frame based on a QoS requirement associated with the QoS stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AT&T INTELLECTUAL PROPERTY II, L.P.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Wei Warren, US 534 4288

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00