Test platform for high-frequency cable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874590
SERIAL NO

15125311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a test platform for high-frequency cable, comprising conductive contacts and clamps for pressing a conductor of the cable on the conductive contact, and comprising a splitter seat, which comprises a top surface and a plurality of varied sides, the conductive contacts are respectively arranged on the sides, the clamps are arranged at a peripheral of the splitter seat and is opposite to the conductive contact, the splitter seat is further provided with a splitter channel, and the splitter channel slantingly connects the top surface to the sides. The present invention adopts a splitter seat with a polyhedral structure, which may shorten the stripped length, and prevent for vertically bending the core, thereby reducing the damage to the cable structure to the greatest extent, and greatly increasing the test frequency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHANGHAI ELECTRIC CABLE RESEARCH INSTITUTE;SHANGHAI SECRI OPTICAL & ELECTRIC CABLE CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gong, Jiangjiang Shanghai, CN 1 0
Jiang, Bin Shanghai, CN 168 701
Shen, Nallian Shanghai, CN 1 0
Yin, Ying Shanghai, CN 10 92
Zhang, Cheng Shanghai, CN 317 3033

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00